Concept study · no client attached

A new build, given some age

Ten-foot ceilings, an open plan, and absolutely nothing to look at. The problem with a new build isn't taste, it's that there's no architecture for taste to attach to. So we add some.

Material samples for A new build, given some age

The room

RoomGreat room, 20 ft × 18 ft, open to the kitchen
Ceilings10 ft, flat drywall
LightSouth and west, very bright, no window treatments
StayingEverything. No construction beyond trim carpentry.
Budget$32,000, furnishings, millwork and paint

Nothing in this room is wrong. It's just that nothing in it is anything. A house like this needs one architectural move and about four material decisions, and then it stops feeling like a showhome.

The single highest-value thing you can do is a paneled or battened wall behind the sofa. It costs less than the sofa, it takes a carpenter two days, and it gives every other decision in the room something to sit against.

The second is limewash. On a ten-foot flat wall, flat paint is flat. Limewash moves, and it's the closest thing to old plaster you can get with a roller and a brush.

What it becomes: a room that reads as though it was built by somebody who cared, rather than assembled from a spec sheet.

Palette

SurfaceColourCodeFinish
WallsAlabasterSW 7008Limewash or matte
Paneled wallAccessible BeigeSW 7036Matte
Trim and ceilingAlabasterSW 7008Satin / flat
Built-ins or beamsUrbane BronzeSW 7048Matte
Kitchen island, if it's in viewPewter GreenSW 6208Satin

Real codes. Sample them on the actual wall and look at them at three different times of day before committing.

Materials and finishes

  • Limewash on the main walls — one weekend, transforms the room
  • White oak, rift sawn, for any new millwork
  • Two 6 × 8 in box beams across the short dimension, stained not painted
  • Bouclé on one chair only, never the sofa
  • Unlacquered brass and blackened steel together
  • A honed stone or burl coffee table with real movement

The plan

Twenty by eighteen is close to square, which is easier than it sounds — it means one large seating group rather than two competing zones.

Anchor the sofa on the new paneled wall, 96 to 104 inches, floated 20 inches off it. Two chairs opposite facing back toward the kitchen, so the room talks to the cooking rather than turning its back on it.

A 10 × 14 rug with all legs on. In a room this size, a 8 × 10 will look like a postage stamp and it's the most common mistake in new builds.

Keep 42 inches clear on the kitchen side — that's the through-route, and it needs to be generous enough that nobody edges around the sofa carrying a tray.

Specifications

ItemWhat to look forDimensionsBudget
SofaDeep, low, performance fabric in oat or greige96–104 in wide$3,200–6,500
Chairs, pairOne in bouclé, one in leather — not matching30–32 in wide$1,600–3,400
RugWool, low pile, tonal10 × 14 ft$1,800–4,500
Coffee tableStone, burl or travertine, 16–18 in high48–54 in$900–2,600
Media consoleWhite oak, low and long72–84 in wide$1,200–2,800
Paneled wallBoard and batten or applied moulding, paintedFull wall, 10 ft$1,400–3,000
BeamsTwo box beams, stained white oak6 × 8 in, 18 ft span$1,600–3,500
DraperyLinen, ceiling-mounted, both window wallsTo floor$1,800–4,000

Specifications, not products — what to look for rather than a link that will be dead in six months.

Where the money goes

CategoryAllocationShare
Millwork — panelling and beams$5,50017%
Upholstery$8,00025%
Rug$3,0009%
Drapery$3,0009%
Case goods and tables$4,50014%
Lighting$3,0009%
Art and accessories$3,0009%
Paint and limewash$1,2004%
Contingency$8004%

The millwork is the line most people cut first and it's the one that makes the difference. Cut the coffee table and the art budget before you cut the panelling — you can add those later, and you can't easily add architecture.

Lighting

  • Replace the builder's flush mounts. This is the fastest tell in any new build.
  • One 30–34 in fixture centred over the seating, hung with the bottom at 7 ft minimum
  • Two table lamps and one floor lamp — the ceiling light should rarely be the only thing on
  • Picture lights on the paneled wall, hardwired if the carpenter is already there
  • Dimmers on everything. On a ten-foot ceiling, undimmed light is unforgiving.
  • 2700K throughout, and check the kitchen cans match — mismatched colour temperature across an open plan is the thing you can't unsee.

The order to do it in

  1. Millwork first, while the room is empty. Panelling and beams are dusty and everything else waits on them anyway.
  2. Limewash and paint.
  3. Lighting swap — do this before furniture, while ladders are still easy to place.
  4. Rug, then sofa. Order both early; upholstery is 10–14 weeks.
  5. Chairs, console, tables.
  6. Drapery, measured after the millwork is finished, not before.
  7. Accessories and art last, over a month, not in one afternoon.

What will go wrong

  • Undersized rugs. A 8 × 10 in a 20 × 18 room is the single most common new-build mistake and it makes an expensive room look cheap.
  • Ordering upholstery late. Ten to fourteen weeks is normal, and it will be the thing holding up your install.
  • Matching furniture sets. A sofa and two identical chairs from the same collection is exactly what makes a new build feel like a showroom.
  • Bouclé on the sofa. It's beautiful and it pills, and with kids it'll look tired within a year. Put it on a chair.
Your house

This is what a Room Refresh looks like.

The same thing, built for your room, your budget and the way your family actually uses the space. Virtually anywhere, or in person across Chicagoland.

See how it works